PERI Ltd. UK, Cost Saving - Formwork, Scaffolding, Engineering

Cost saving

How does the cost of the PERI formwork solution compare to traditional methods?
pie diagramm
Pie diagramm 2

53% Formwork Labour30% Formwork Labour
30% Concrete Materials
30% Concrete Materials
10% Formwork Materials
15% Formwork Materials
7% Concrete Labour
7% Concrete Labour
  
18% Saving

Typically, spending just an extra 5% on formwork can save you 23% of your labour costs resulting in a overall reduction in costs of 18%.