The structure is based around two cores whose shaft walls and wing walls were climbed with PERI CB 240 climbing scaffold and TRIO panel formwork.
|
|
A consortium of Alstom and Amec Industrial have been commissioned to install a Sea Water FGD plant as part of a major capital improvement programme by Scottish Power that will secure the future of Longannet Power Station – the second largest ...
|
|
Welsh Contractor, Andrew Scott Ltd, employed radically different construction methods than those used 40 years ago when replacing a massive Radial Clarifier Tank at the Corus steelworks in Port Talbot.
|
|
One of the largest distribution centres in Europe has been constructed with an area of more than 60,000 m² at the new Central Park industrial facility at Rugby.
|