The complicated design of the concrete shell presented many challenges to PERI design engineers particularly due to the varying dimensions of each consecutive slab.
|
|
PERI’s fabrication team was also called into action with the off-site fabrication of 1,600 m² of pre-assembled VARIO wall formwork panels.
|
|
Achieved through high-tech insitu casting, these elements - designed to copy the stylish slants and angles of its historic racing machines - now combine to create a geometry that is as striking to behold as it was challenging to build.
|
|
When completed in July 2005 the new 4 storey Medical Research Centre building for Edinburgh University will be linked into the new Edinburgh Royal Infirmary.
|
|
Edinburgh University has invested £21m on upgraded student accommodation at its Pollock Halls of Residence on the edge of Holyrood Park.
|