In February 2005 the Welsh Assembly awarded Carillion the £71 million design and construct contract on the M4 widening scheme. The section between Castleton and Coryton was opened in 1980 as a dual 2 lane motorway. However because of substantial ...
|
|
Perth-based I & H Brown won a £10.5 Million contract from Taylor Wimpey and Persimmon Homes to provide civil engineering infrastructure for over 600 new homes at Overton Farm in Falkirk. In addition to 600,000 m³ of bulk earthworks to shape ...
|
|
Basis of the PERI solution was the skilful combination of VARIO standard elements with made-to-measure filler elements which was carried out using rentable standard components.
|
|
Mass concrete formers mirroring the arch of the soffit of the bridge were cast on the ground adjacent to the bridge using PERI’s compact panel system.
|
|
With 100 units on site, the parapet work constituted over 75% of the PERI contract, but it was shuttering for a column that had to be totally replaced that made this particular job different.
|