DCT Civil Engineering was awarded a £2 million contract to build a sewage detention tank for United Utilities in West Kirby, Merseyside. While pre-cast concrete blocks were used for both the outer tank walls and the central vacuum flush chamber, ...
Scottish Water Solutions are undergoing a major redevelopment project to Glendevon Water Treatment Works, which is a 90 mega litres per day plant supplying Fife in Scotland. Black and Veatch are the main contractor on the £12.5 Million project ...
Sub contractor, Bell Formwork Services Ltd were offered a £1.5 million contract to build the two 20m diameter concrete tanks. Working in cooperation with PERI, they decided to pour the 20m high tank walls in four pours using 5m high curved ...
PERI‘s core product, the TRIO wall formwork panel system is currently being used to construct a new 9 m high aeration tank for the extension of an existing wastewater treatment facility at Budds Farm in Havant, Hampshire.
Reinforced Structures Proprietor, Dave Johnson, chose to have the RUNDFLEX circular wall formwork for the 19m diameter Final Settlement Tanks pre-fabricated by skilled craftsmen at the PERI fabrication workshop in Rugby.