|
Main contractor, HBG Construction appointed Thames Valley Construction to erect the three storeyhigh concrete frame within a 14 week programme. PERI’s TRIO wall panel formwork, MULTIPROP tables, FB 180 platforms and VARIO girder column formwork ...
|
|
For forming the almost 3 m high walls, the TRIO 270 elements were simply extended with narrow, primarily 30 cm wide panels positioned horizontally.
|
|
PERI have supplied 82 No. lightweight aluminium DOMINO wall panels for a CALA Homes (east) Ltd housing development in Edinburgh.
|
|
Imperial Wharf is located at Imperial Road, Fulham, London. The site is a mixed use development with Block C1 being a private residential building.
|
|
Located on the North bank of the River Clyde, to the West of Glasgow city centre, this £56m development of 261 apartments is the first major residential development to form part of the regeneration of the Clyde waterfront.
|