Three60 is one of the newest high rises on Manchester’s skyline, standing 51 stores tall with over 400 apartments. With temporary works support from PERI, Renaker is delivered this project as part of the wider Great Jackson Street development scheme.
PERI's lightweight protection screen provides climbing protection and a safe enclosure for high-rise construction. These were installed over four floors. In addition to deflecting wind loads as the building grew in height, the design of these screens had to account for other demands, such as cycle time, access to the slab edge and avoid potential clashes with columns.
The XL Hoist provides a high-capacity transport solution for high-rise construction that speeds up site operations, freeing up time for cranes to do more of the heavy lifting. The system can be cantilevered, serve the wet deck, and is easy to relocate if required. It can be integrated around any type of climbing protection screen, including PERI LPS and RCS systems.
The most effective climbing solutions are the ones taken into consideration early on. Selecting the right climbing formwork is not just choosing any system, but the one that will work best for the project's requirements. PERI's specialists can support you right from the planning stage all the way through to delivery, ensuring you make the right choice for the best outcome.
Using 3D modelling and BIM, our digital engineering experts can identify potential clashes in the project programme between temporary works elements like propping and falsework. Having this information early on helps your site teams to improve coordination and reduce the risk of costly changes during construction.
Staged visualisations and animations can also demonstrate the climbing sequence, formwork movements and construction methodology. These digital services can support project coordination, method statements, risk assessments and workforce communication.
Our support goes beyond just the design and supply of a system. PERI site teams can provide practical support throughout your project, helping ensure climbing equipment is understood, handled correctly and integrated efficiently.
For climbing formwork applications, qualified PERI supervisors can demonstrate the correct operation and handling of the system, explain drawings, and provide guidance on maintenance and cleaning. This ensures that those handling the systems on site understand the equipment and its intended use, supporting safe and efficient climbing.