The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours

Royal Victoria Hospital
Belfast, United Kingdom

A cantilever deck of  30,000m² floor deck slab with concrete-to-floor slab volume of approx. 8,000m³.  

400mm thick RC slab with an additional grid of 2.40m x 2.50m concrete beams on top.

Location
Main Application
Education & Healthcare

The Project

  

Project Information

"PERI provided a total project solution and delivered excellent quality design."
Michael Lynch
Project Director

Related Products

Are you building a project like this?

Call us on 01788 861600 to discuss your requirements further.

Call us on 01788 861600 to discuss your requirements further.

The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours
The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours