PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls

Project Overview

Together with our customers we create great things. Whether scaffolding, skyscrapers, bridges or tunnels, we will show you which projects we have realized together with our customers.

All Projects

The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes
Infrastructure formwork for a driverless rail link service.
PERI's climbing protection panel conforms with Health & Safety Fall from Height Regulations
PERI UP - the versatile scaffolding system aids a hospital build in Belfast
PERI finds the right solution for the One Tower Bridge, London construction
Project-specific formwork ascends on MECD’s irregular-shaped cores.
The efficient PERI UP system is quick and easy to erect, and it provided safe access to the site.
PERI provides the solution for a 36m deep shaft
Meeting formwork demands on Hinkley Point C
A timber gridshell shapes the undulating roof and gives the distillery its unique geometry
Different PERI wall formwork systems used to construct new tropical enclosure at Chester Zoo
PERI UP Modular System Scaffolding was used for the external scaffold around the three digester tanks.
PERI provides a range of formwork and scaffolding products to the new Forth Bridge crossing
PERI ACS (Automatic Climbing System), deployed with RCS (Rail Climbing System) with VARIO. Shows the very high concrete finish below climbing systems on the North Core.
The drum formwork was integrated with heavy-duty trusses comprising RCS rail frames and heavy-duty rollers to facilitate movement.
A photo taken in London at the Victoria Embankment. It shows the construction of a shaft to redirect sewage.
South Quay Plaza
Brunel Building, North Wharf Road
Delivering an architectural concrete finish for a 19th century building.
VARIO is a high load bearing wall formwork system using PERI GT24 Girders
PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls
Delivering a high-grade architectural finish for a world-changing university.
Rolls Royce, Derby
Bespoke formwork delivers unique architectural concrete requirements.
For these cores on the V&A Stratford project, we provided ‘up and over’ access using our PERI UP Flex scaffold so operatives could gain access from one side of the VARIO formwork shutter to the other. This was crucial as the final floor levels followed up behind the core and were not yet in place.
MULTIPROP with SKYDECK for slab formwork from PERI
RCS supported the spider boom platform to facilitate concrete placement on the core
Efficient formwork and falsework for one of Scotland’s busiest roads.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
The solution by PERI is realised in the finish of the concrete walls for the Aquatics Centre for London 2012
LPS - PERI's mesh protection panel ensures safe working conditions in all weathers
Steel reinforcement ties the core together
1277 bespoke VARIO shutters were fabricated and delivered to the site
Concrete House, Sussex
The A52 Clifton Bridge, a major National Highways upgrade project in Nottingham, is a complex structure, which required repairs inside and underneath the bridge to strengthen the concrete.
One Park Drive, Wood Wharf
PERI CB Climbing System
TRIO Wall Formwork
SKYDECK Slab System
Versatile falsework from PERI assists construction of new sweet factory
Greenwich Peninsula
One of the most significant infrastructure projects ever undertaken in the UK, London’s Crossrail is a high-frequency, high-capacity service enabling faster travel across the capital.
The Werrington Grade Separation scheme will make way for a new diveunder railway line.
Custom-made cleats realised the unique shape of the piers.
VARIOKIT, the adjustable formwork for tunnel projects supplied by PERI
Aberdeen Western Peripheral Route/Balmedie to Tipperty (AWPR/ B-T)
PERI VARIOKIT VK-P Platform System
Section of the Stafford Multi-Storey pre-cast car park with PROKIT edge protection
PERI CB Climbing System
TRIO Wall Formwork
System
PERI UP Easy provides access on Blake Tower
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
PERI UP Easy Scaffolding was used to replace cladding on The Link residential building in London
Bermondsey Drive Under
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Scaffolding used on Payne Road.
Metal scaffolding wraps around the side of a multi-storey residential building.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interested in how PERI can support your next project?

Call us on 01788 861600 to discuss your requirements further.

Contact us